FAQ

Got Questions? We’ve Got Answers

If you have a question, it’s a good idea to start below to look for answers in our FAQ section. We have tried to answer the most commonly asked questions as best we can.

A base course of sand and stone should be put down first and compacted down hard. Ideal depth when doing any Asphalt work is 50mm but with our product 25 to 30 mm should suffice.

No, this is not necessary.

Yes and then compacted again after crowned to ensure that it is compacted down hard. The one draw back that we have with ANY cold asphalt is the curing time because in this time frame any stiletto type shoes and walking sticks with sharp points may pierce the Asphalt and cause holes

Asphalt is Lifetime performance guarantee so as long as the area surrounding the repair stays intact our product should too.

Minimum 25mm ideally 50mm.

1 x 20kg bag will cover approx. ½ square metre at 22mm thickness or 1 tonne bulk bag will cover 25 Square metres.

Rule of thumb for compaction rates is whatever the mix size times by 2.5 for minimum compression and maximum is 4 times. For Example Mix 10 product minimum compaction is 25mm and maximum is 40mm.

Asphalt in a Bag GREEN can** contain recycled material. It has ZERO VOC’s*, and Asphalt in a Bag GREEN will NOT leech any hydrocarbons.

Mix 10, Mix 7 and a (Mix 5 if requested – Lead time required for manufacture). All mixes are dense mixes and unique to Asphalt in a
Bag.

  • Density is probably the most important parameter in the construction of asphalt mixtures; the inclusion of more dust and a therefore higher % of blend in our Asphalt in a Bag Dense Mix, allows less space or ‘voids’ between dust and stones. The proportion of air voids in a compacted asphalt mix is a critical performance characteristic.
  • A lower percentage of voids prevents the permeation of air and water, this is ideal in an asphalt repair and an important specification to consider. It certainly proves to be the difference between the success or failure of a repair.
  • Yes, Asphalt in a Bag GREEN is considered and environmentally preferable purchase (EPP). It is also the first product to be endorsed by the National Eco-Friendly Energy Council in the USA.

Yes! Other companies are calling their cold patch products GREEN simply because they contain recycled asphalt and yet they still contain harmful chemicals and have high VOCs. We are truly GREEN in that we have completely removed the toxic solvents from our product. And yes, we can include recycled asphalt. Our bags are made of recyclable plastic.

12 months in a sealed bag.

DID YOU KNOW – Volatile organic compounds, sometimes referred to as VOCs, are organic compounds that easily become vapours or gases. Along with carbon, they contain elements such as hydrogen, oxygen, fluorine, chlorine, bromine, sulphur or nitrogen.

**Virgin aggregate is used in the manufacture of the Asphalt in a Bag as this is currently a cheaper option than recycled asphalt.

One More Question?
If you have not found the answer to the question you are looking for. Simply use the website contact form or click the button below to get in touch and we will be happy to answer your questions.

Get in Touch